Extended Search

- in all fields
- in the title
- in key words
- in the abstract
- in the bibliography
Issue
Name
Authors
Category
2018/1
New equipment for downhole sucker rod pumping unit. Development and reliability analysis in small diameter side tracks
Geosciences

Authors: Shagabytlin A. ALIEV (b.1992) graduated from the Russian State University of oil and gas (National Research University) named after I.M. Gubkin in 2015. Post-graduate of „engineering mechanics” department of the Gubkin Russian State University of Oil and Gas (National Research University). Author of 2 publications in the field of oil and gas equipment. E-mail: mr.aliev111@mail.ru
Aleksei V. DEGOVCOV graduated from Gubkin Moscow Institute of petrochemical and gas industry in 1982. Candidate of Engineering Sciences, Associate Professor of the Department of Machines and Equipment of Oil and Gas Industry at Gubkin Russian State University of Oil and Gas (National Research University). A specialist in the field of pumping equipment production of oil and gas. Author of 65 publications in the field of oil and gas equipment. E-mail: degovtsov.aleksey@yandex.ru

Abstract: The cable rod is established in the place of the maximum rates of set of curva-ture for elimination of abrasion of a column of NKP and bars, for reduction of friction forces in couple of „bar pipe”. The article questions of a possibility of use of ropes of a different design as a rope bar are taken up. Results of researches of strength properties of plastically pressed out ropes of the Beloretsk plant the conditional module of elasticity of these ropes is defined and justifies the scope of such ropes as the sucker- robs. The design of the pump developed by authors with the vacuum chamber provi-ding the movement of rope bars at the course down is shown. Results of calculations of reliability (average operating time and probability of no-failure) of borehole pumping installations a cable rod (BPI with СR), are presen-ted on wells of LLC LUKOIL-PERM. Impact assessment of such factors as adjournment of ASPO, a deviation angle from a vertical and length of a rope bar on an average operating time is given.

Index UDK: 622.276.53

Keywords: cable rod, well, lateral trunk, reliability, probability of failure-free operation

Bibliography:
1. Opyt jekspluatacii skvazhin s bokovymi stvolami malogo diametra, ShSNU s kanatnoj shtan-goj v OOO „LUKOJL-PERM”. V.N. Ivanovskij, A.V. Degovcov, A.A. Sabirov, S.S. Pekin, E.V. Kachin, S.G. Patrushev, S.V. Popov. „Territorija NEFTEGAZ”. M.: Kamelot-Pablishing, 2015, no. 3, p. 78-87.
2. Ivanovskij V.N., Sabirov A.A., Degovcov A.V., Pekin S.S. Kanatnaja nasosnaja shtanga Patent na izobretenie No. 2527275 zaregistrirovano v Gosudarstvennom reestre izobretenij RF 08.07.2014 g.
3. Slepchenko S.D. Ocenka nadezhnosti UJeCN i ih otdel’nyh uzlov po rezul’tatam promyslovoj jekspluatacii. Diss. na soiskanie uchenoj stepeni kand. tehn. nauk. M.: RGU nefti i gaza imeni I.M. Gubkina, 2011, p. 21-26.
4. Analiz verojatnosti bezotkaznoj raboty skvazhinnyh nasosnyh ustanovok s kanatnoj shtangoj na mestorozhdenijah OOO „LUKOJL-PERM”. V.N. Ivanovskij, A.V. Degovcov, A.A. Sabirov, Sh.A. Aliev, O.V. Tret’jakov, I.I. Mazein, A.V. Usenkov, S.V. Merkushev, D.N. Krasnoborov. Territorija „NEFTEGAZ”, 2017, no. 7-8, p. 74-80.
5. Ivanovskij V.N., Sabirov A.A., Degovcov A.V., Pekin S.S., Aliev Sh.A. Patent na poleznuju model’ No. 173961 „Skvazhinnyj shtangovyj nasos”.
6. Metodika opredelenija nadezhnosti pogruzhnogo oborudovanija i opyt ee primenenija. O.M. Perel’man, S.N. Peshherenko, A.I. Rabinovich, S.D. Slepchenko. Burenie i neft’, 2010, no. 2, p. 32-34.